We identify, assess and rank the risks of your workplace or construction site and turn them into an action plan. It is the technical basis of the Internal Civil Protection Program, the STPS safety program and the selection of personal protective equipment.

STPS External Training Agent SSC-190417-RV8-0013 Jalisco Civil Protection CONS-028-02/2026 · IEPC-093-06/2026
1
See how risks are rankedTry the probability by consequence matrix.Try the matrix →
2
Get a quote for your studyPriced by floor area, processes and number of positions.Get a quote →
3
Receive your proposalFormal, within one business day. The study serves for the PIPC, the STPS program, insurers and tenders.
Service scope

What is included?

  • Risk analysis of the workplace or construction site: matrix, ranking and risk map
  • Job risk analysis for PPE selection (NOM-017)
  • Internal and external risk studies for the Internal Civil Protection Program
  • Contingency and business continuity plans
  • Damage assessment and recommendations after an event
  • Environmental risk studies when the permit requires them

When to request it?

Before opening a workplace, when starting a construction project, when a process changes, after an incident, or when the authority or an insurer requests it. Also when the company wants to stop buying PPE from a catalog and start buying it based on actual risk.

Interactive tool

How a risk is ranked

In the study we rate each hazard by its probability and its consequence. The result defines what is addressed first and with which measures. Choose a cell in the matrix.

  • ✓A document with the matrix, risk map, ranking and action plan.
  • ✓It serves for the PIPC, the STPS program, insurers and tenders.

Illustrative example of a 5 × 5 matrix. In your study, the scale and criteria are adjusted to the applicable regulations and to your process.

Probability × consequence
Probability →5432112345Consequence →
  • Low 1–4
  • Medium 5–9
  • High 10–16
  • Critical 20–25
High risk · 12 points

Probability 4 × consequence 3. Priority: immediate controls and close follow-up.

How we work

From assessment to closure

Site survey

Walkthrough, interviews and review of processes and equipment.

Assessment

Risk matrix with probability, consequence and ranking.

Action plan

Measures by priority, owners, costs and dates.

The first step is always the assessment.Tell us about your workplace and we will tell you what the authority requires and in what order to address it. No commitment.
Request an assessment and quote

Frequently asked questions

Have another question?

A specialist answers in the chat or by phone, with no commitment.

Call 33 4387 9184
Is it the same as the NOM-030 assessment?

They complement each other. The NOM-030 assessment checks whether your workplace complies with each standard that applies to it; the risk analysis evaluates each hazard by job position and process (probability, consequence and existing controls) and defines the measures to reduce it. Together they feed the annual safety and health program and the Internal Civil Protection Program, and they are the documents the authority asks for first in an inspection.

Is the risk analysis included in the Internal Program?

Yes. If you hire the Internal Program with us, the analysis of the building’s internal and external risks is already included. As a separate service it makes sense when an insurer or a tender requires it, or when you need to select PPE by job.

Get a quote for Risk studies and analysis